RANGELY | The main topic of the most recent Rio Blanco Water Conservancy meeting was news that despite the recent $2.5 Million repair, the Hydro power unit is not in operation yet. Originally, the hydraulics seized due to solids in the oil, all the oil has been flushed and replaced[Read More…]


